Find the topic you need in the online index!

The 2017 National Renovation & Insurance Repair Estimator has a complete cross-referenced index. Find the subject you need in the left column. Then click on the subject link in the right column to jump to the costbook page.

2017 National Renovation & Insurance Repair Estimator

Subject Subject links
Columns 
  additional costsTop of Page 49  
  cleaningTop of Page 40  
  cost adjustmentsTop of Page 52  
  demolition costTop of Page 55  
  flutedAdditional column and pilaster costs.  
  installation costTop of Page 55  
  labor costsTop of Page 55  
  labor productivityTop of Page 55  
  lallyTop of Page 359  
  minimum chargeTop of Page 49  
  paintingTop of Page 280  
  plasterAdditional plaster costs.  | Plaster pilaster or column.  
  repairColumn and pilaster repair.  
  repair costTop of Page 55  
  roundAdditional column and pilaster costs.  
  squareTop of Page 50  
  stuccoAdditional stucco pilaster or column costs.  | Additional synthetic stucco costs.  | Minimum charge  | Stucco pilaster or column.  | Stucco repair.  
  taperedAdditional column and pilaster costs.  
  time & material chartsTop of Page 54