Surface Preparation and Striping for Athletic Courts (cont.) Use $150 as a minimum job charge.
Rubber cushioned concrete pavers
  18" x 18", dry joints FL@.039 SF 19.90 1.97 21.87
Striping for athletic courts
  Marked with white or yellow striping paint
    Lines 3" wide PA@.005 LF .07 .26 .33
    Lines 4" wide PA@.005 LF .09 .26 .35
    Lines 4" wide, reflectorized PA@.002 LF .22 .10 .32
    Lines 8" wide, reflectorized PA@.004 LF .44 .21 .65
  Marked with reflectorized thermoplastic tape
    Lines 4" wide PA@.004 LF 1.58 .21 1.79
    Lines 6" wide PA@.006 LF 2.41 .31 2.72
  Symbols, lettering
    Within 2'-0" x 8'-0" template PA@2.50 Ea 62.10 131.00 193.10
Playground Equipment Equipment cost is for a 4,000 lb. capacity forklift. Use $2,500 as a minimum job charge.
Craft@Hrs Unit Material Labor Equipment Total
Balance beams. All are supported 12" above the ground by 2-3/8" OD galvanized pipe uprights.
  10' long “Z”-shaped beam S6@6.00 Ea 420.00 274.00 69.20 763.20
  10' long curved beam S6@6.00 Ea 546.00 274.00 69.20 889.20
  10' long straight beam S6@6.00 Ea 412.00 274.00 69.20 755.20
  15' long straight beam S6@6.00 Ea 331.00 274.00 69.20 674.20
  30' long “Z”-shaped beam S6@9.00 Ea 644.00 411.00 104.00 1,159.00
Geodesic dome beehive climber, 1" galvanized pipe rungs
      8' diameter, 4' high S6@24.0 Ea 570.00 1,100.00 277.00 1,947.00
  13' diameter, 5' high S6@36.0 Ea 1,710.00 1,650.00 415.00 3,775.00
  18' diameter, 7' high S6@48.0 Ea 2,140.00 2,190.00 554.00 4,884.00
Horizontal ladders, 20" wide with 1-1/16" OD galvanized pipe rungs 12" OC and 2-3/8" OD galvanized pipe headers and top rails
  12' long, 6' high S6@6.00 Ea 728.00 274.00 69.20 1,071.20
  18' long, 7' high S6@9.00 Ea 896.00 411.00 104.00 1,411.00
Rope and pole climbs. Horizontall headers an vertical end posts are 3-1/2" OD galvanized steel tubing.
  10' H x 10' W with three 1-5/8" diameter poles S6@24.0 Ea 1,070.00 1,100.00 277.00 2,447.00
  10' H x 10' W with three 1" diameter ropes S6@24.0 Ea 1,160.00 1,100.00 277.00 2,537.00
  16' H x 12' W with three 1-5/8" diameter poles S6@24.0 Ea 1,450.00 1,100.00 277.00 2,827.00
  16' H x 12' W with three 1-1/2" diameter ropes S6@24.0 Ea 1,640.00 1,100.00 277.00 3,017.00
Sandboxes, prefabricated. Painted galvanized steel, 12" high, pine seats, sand not included
        6' x 6' S6@9.00 Ea 454.00 411.00 104.00 969.00
    12' x 12' S6@12.0 Ea 645.00 549.00 139.00 1,333.00
  Masonry sand — CY 38.30 — — 38.30
  Washed plaster sand — CY 49.00 — — 49.00
  Concrete sand — CY 63.60 — — 63.60
  White silica sand — CY 84.30 — — 84.30
Sand scoopers, crane simulator. Heavy-duty metal construction. Two handles control crane arm height and sand scooper, set in concrete.
  3' high miniature scooper with seat CL@2.15 Ea 497.00 87.00 74.40 658.40
  4' high rotating stand up scooper CL@2.75 Ea 510.00 111.00 95.20 716.20
      Masonry sand — CY 38.30 — — 38.30

The figures above are from a time and money saving construction cost manuals from Craftsman Book Company. Over 50 cost estimating databases are available and all come with the popular National Estimator program.

National Estimator helps you compile estimates and bids for any construction project

National Estimator lets you use these costs to create estimates for new construction, repair and remodeling, commercial and industrial projects. Copy and paste and anything you see here into your estimate. Then add overhead and profit and print the bid – or turn your bid into an invoice that goes out in a window envelope. It’s quick, easy and flexible.

Find out more about using these cost estimates with the National Estimator program:

Click here for more information on getting these cost estimates in book form and CD-ROM

Click here for more information on getting these costs as a download on the Web.

National Estimator Includes the following features:
Prints estimates and saves estimates to disk.
Add any percent for overhead, profit and sales tax. Plus, show or hide markup and unit costs.
Change, copy, revise or delete an estimate at any time.
Use your own labor rates and man-hour estimates.
Export to Excel, Word, QuickBooks Pro and others
Organize estimates by division with subtotals.
Turn estimates into invoices
No need to be connected to the Web when estimating.
Includes an extensive help system and free phone support.
CD-ROM includes the Watch Me video on disk.

www.contractors-license.org